Skip to content

For regulatory teams

Walk into the audit already ready.

Each record carries its own audit trail, always current, and inspection packets are assembled on request. Auditor requests and lot traces are answered in plain words, with the source records attached.

How it works
Inspection packet · PCM-500Assembled

Inspection packet · PCM-500

Assembled on request · every item names its source · sample

RECORDINCLUDEDSTATUS
MFR-PCM-500 v4.2Effective version and approvalsAttached
B-2411-068Batch record and signaturesAttached
DEV-0412Deviation and its evidenceAttached
CAPA-0091CAPA, tracked to closureAttached
One audit trail per record
Every draft, signature and release, always current.
Inspection packets
Assembled on request, with their sources.
Answers name their sources
Down to the version of the document.

Audits and annual product review

Ask in plain words. Check the answer in one click.

Ask pulls the evidence for an audit, and every answer names the records it came from. Inspection packets are assembled on request instead of compiled by hand.

  • Ask pulls the evidence, with its sources
  • Every answer links its documents, down to the version
  • Inspection packets assembled on request
ASK

Which batches used lactose lot L-2209?

ANSWER

Three batches, all released. None has an open deviation.

B-2411-061ReleasedMES
B-2411-064ReleasedMES
B-2411-066ReleasedERP

Traceability and recall readiness

Trace a lot across systems in one question.

Each value on the record keeps the system it came from, and masters link each lot to its supplier and line. Ask traces a lot across MES, LIMS, and ERP.

  • Ask traces a lot across MES, LIMS, and ERP
  • Masters link each lot to its supplier and line
  • Source system on every value
B-2411-068 · QC RESULTS
TESTRESULTSOURCE
Assay99.2 %LIMS
Dissolution94 %LIMS
OrderSO-5520ERP
WHERE THIS VALUE CAME FROM
SystemLIMS
Lot7731
Read byGoverned connector, role QC

MFR authoring and tech transfer

See what changed, version to version.

Sections come from a managed template library, and parameters are validated on save and on publish. Reviewers see what changed between versions.

  • Sections drawn from a managed template library
  • Parameters validated on save and on publish
  • Reviewers see the change, version to version
MFR-PCM-500 · DRAFT v4.32 changes
PARAMETERv4.2v4.3
Impeller speed140–160 rpm140–160 rpm
Granulate hold time36 h48 h
Dry to LOD≤ 3.0 %≤ 2.5 %
Blocked on saveStep 4.5 has a value with no range. Add a limit to publish.

How it works

From an auditor's request to the packet

  1. 01The requestAn auditor asks for a batch's records.
  2. 02AskAsk pulls the evidence across the records.
  3. 03Sources namedEvery answer names the records it came from.
  4. 04Packet assembledThe inspection packet is assembled on request.
  5. 05Trail currentEach record's audit trail is already up to date.

What changes

The week before, and the week after.

TODAY

  • Binders compiled from systems that don't talk to each other
  • Weeks of manual compilation for each product review
  • Auditor requests answered by searching the archive
  • A complaint starts a search across paper and four systems

WITH SYNNGULAR

  • One audit trail per record, always current
  • Ask pulls the evidence, with its sources
  • Inspection packets assembled on request
  • Ask traces a lot across MES, LIMS, and ERP

What regulatory teams use

Evidence ready before the inspector asks

  • Audit trailEvery draft, change, and approval, per record.
  • Cited answersEvery answer names the documents and records it came from.
  • Audit evidenceInspection packets assembled on request.
  • Trace a lotLot, line, supplier and signatures in one question.
  • e-SignaturesSigner, date, time and meaning recorded with every signature.
  • MFR authoringStructured sections and tables, validated on save and publish.

45%

better audit readiness in Morepen's deviation and CAPA engagement.Figures measured and reported by Morepen.

Read the case study

See it with your regulatory team.

Bring one product and one workflow. We scope the pilot against your plant.