Skip to content

For generics manufacturers

Turn every batch record around faster.

Generics plants run volume records on thin margins, so how fast a record turns around is the margin. Entries are checked as they are typed, QA reviews only the exceptions, and release readiness reaches QA every Monday.

How it works
Line 2 · release queue1 exception

Release queue · line 2, plant 1

Review by exception: entries within their limits cleared on their own

BATCHPRODUCTEXCEPTIONSSTATUS
B-2411-066PCM-5000Released
B-2411-067PCM-5000Ready for release
B-2411-068PCM-5001 · DEV-0412Review
B-2411-069PCM-500—In execution
Checked at entry
Each value is checked against its limit as it is typed.
Review by exception
Reviewers see exceptions and what changed, not every line.
Release readiness reported
Sent to QA every Monday, on a schedule.

Review by exception

QA reads the exceptions, not every page.

Typed capture checks each value against its range at entry. Entries within their limits clear on their own, so a reviewer opens only what fell outside.

  • Each value checked against its range at entry
  • Reviewers see exceptions and what changed
  • Deviations logged against the batch record, evidence attached
B-2411-068 · 143 ENTRIES1 to review

Green: within limits, cleared on entry. Red: outside its limit, set aside for QA.

ENTRY 4.3 · DRY TO LOD

0 %limit 2.5 %2.7 %

Checked at capture

Entry errors are caught on the floor.

Values are captured at execution, against the cell they were defined for. Gates block movement until conditions pass, so a missing entry is caught before the record reaches QA.

  • Values captured at execution, against the cell they were defined for
  • Numbers carry units and ranges
  • Gates block movement until conditions pass
SECTION 3 · DISPENSINGAll values in range, signedComplete
SECTION 4 · GRANULATIONWaiting for the section gateQA sign-off on section 3 opens this section
SECTION 5 · COMPRESSIONLocked, still visible

Release readiness

The release list is ready before the day starts.

Report sends scheduled digests to QA and production leads, like release readiness every Monday. Watch compares batches, yields and cycle times run to run on each scheduled run.

  • Release readiness reported to QA every Monday
  • Yields and cycle times compared run to run
  • Every report names its records
Release readiness, week 48To QA leads, plant 1 · Mon 07:00
Ready for release12
Waiting on QA review3
Held by a deviation: B-2411-068, DEV-04121
Qualification lapsing: tablet press TP-04, 6 days1

Read only. No record was created, changed or signed.

How it works

From the floor to release, batch after batch

  1. 01Made on the floorOperators follow the recipe step by step.
  2. 02Checked as typedEach value is checked against its limit as it is typed.
  3. 03Exceptions set asideOnly entries outside their limits reach QA.
  4. 04Readiness reportedRelease readiness reaches QA every Monday.
  5. 05ReleasedQA signs, and the batch is released.

What changes

The week before, and the week after.

TODAY

  • Reviewers check every page of the paper record, line by line
  • Missing or wrong entries go back to the floor for correction
  • Release waits on values re-typed into ERP
  • Release readiness built by hand in a monthly workbook

WITH SYNNGULAR

  • Typed capture checks each value against its range at entry
  • Reviewers see exceptions and what changed, not every line
  • Release readiness reported to QA every Monday
  • Batches, yields and cycle times compared run to run

For generics plants

Built for records at volume

  • Gated batch executionTyped capture and section gates on the floor.
  • Review by exceptionOnly entries outside their limits reach the reviewer.
  • e-SignaturesSigner, date, time and meaning recorded with every signature.
  • ReportScheduled digests for QA and production leads.
  • Continuous improvementYield, deviation, and cycle-time analytics.
  • Multi-siteRollups and shared masters across plants.

70%

faster modernisation cycle in Morepen's BMR dossier engagement.Figures measured and reported by Morepen.

Read the case study

Scope your first workflow against your plant

Bring one product and one workflow. We scope the pilot against your plant.