Skip to content

For manufacturing teams

The floor follows the recipe, step by step.

The master formula is written once, approved by QA, and run on the floor one gated step at a time. Each value is checked against its limit as it is typed, and Foresee warns before an equipment or training qualification lapses.

How it works
B-2411-068 · line 2In progress

PCM-500 · Batch B-2411-068

Running MFR-PCM-500 v4.2 · gated by section · sample

SECTIONGATESTATUS
3 · DispensingConditions passedSigned
4 · GranulationValues within limitsIn progress
5 · DryingQA sign-off requiredLocked
6 · CompressionSection 5 completeLocked
Checked at entry
Each value is checked against its limit as it is typed.
Gated by section
A step cannot be skipped; locked sections stay visible.
Author once
Sections drawn from a managed template library.

Gated execution

The floor follows the recipe, step by step.

Typed capture on the floor, section gates and e-signatures. Gates block movement until conditions pass, and locked sections stay visible.

  • Values captured at execution, against the cell they were defined for
  • Gates block movement until conditions pass
  • Numbers carry units and ranges
SECTION 3 · DISPENSINGAll values in range, signedComplete
SECTION 4 · GRANULATIONWaiting for the section gateQA sign-off on section 3 opens this section
SECTION 5 · COMPRESSIONLocked, still visible

MFR authoring and tech transfer

Author once, reuse everywhere, see every change.

Sections come from a managed template library, and parameters are validated on save and on publish. Reviewers see what changed, version to version.

  • Sections drawn from a managed template library
  • Parameters validated on save and on publish
  • Reviewers see the change, version to version
MFR-PCM-500 · DRAFT v4.32 changes
PARAMETERv4.2v4.3
Impeller speed140–160 rpm140–160 rpm
Granulate hold time36 h48 h
Dry to LOD≤ 3.0 %≤ 2.5 %
Blocked on saveStep 4.5 has a value with no range. Add a limit to publish.

Equipment and training qualification

Never learn about a lapse from a blocked batch.

Qualification status lives on the equipment and people masters, and records can only reference what is qualified. Foresee warns before a qualification lapses.

  • Qualification status on the equipment and people masters
  • Records can only reference what is qualified
  • Foresee warns before a qualification lapses
MFR-PCM-500 v4.3 · APPROVAL
  1. ✓DraftedProduction authorSigned
  2. ✓ReviewedProduction headSigned
  3. 3QA approvalQA lead · meaning: approved for useWaiting
  4. 4EffectiveVersion can be used on the floorLocked

How it works

From master formula to a batch on the floor

  1. 01Recipe writtenThe master formula is written once, with the limit for every value.
  2. 02QA approvesQA approves the recipe before anyone can use it.
  3. 03Made on the floorOperators follow it step by step. A step cannot be skipped.
  4. 04Checked and signedEach value is checked against its limit and signed.
  5. 05Ready for releaseThe record is complete, so QA can release the batch.

What changes

The week before, and the week after.

TODAY

  • MFRs copied from the last product and edited by hand
  • Each tech transfer re-typed into a new format
  • Missing or wrong entries go back to the floor for correction
  • Calibration and training dates kept in a spreadsheet

WITH SYNNGULAR

  • Sections drawn from a managed template library
  • Reviewers see the change, version to version
  • Typed capture checks each value against its range at entry
  • Qualification status lives on the equipment and people masters

What manufacturing teams use

From the master formula to the floor

  • MastersProducts, materials, equipment, people, and locations.
  • MFR authoringStructured sections and tables, validated on save and publish.
  • Templates and librariesManaged section library and clean-copy inserts.
  • Approvals and qualificationsRole-bound stages and qualification tracking.
  • Gated batch executionTyped capture and section gates on the floor.
  • ReportScheduled digests for QA and production leads.

70%

faster modernisation cycle in Morepen's BMR dossier engagement, where agents compile the dossier.Figures measured and reported by Morepen.

Read the case study

See it with your production team.

Bring one product and one workflow. We scope the pilot against your plant.