For plant leadership
The picture across lines, without the monthly workbook.
Batches, yields, cycle times and open deviations are compared run to run and rolled up across plants. Agents run on a schedule and send each lead what changed, with the evidence attached.
PCM-500 across plants
Refreshed on each scheduled run · sample
| LINE | BATCHES | YIELD | OPEN DEVIATIONS |
|---|---|---|---|
| plant 1 · line 1 | 12 | 98.4 % | 0 |
| plant 1 · line 2 | 11 | 96.1 % | DEV-0412 |
| plant 2 · line 1 | 9 | 98.0 % | 0 |
| plant 2 · line 2 | 10 | 97.7 % | 0 |
- Multi-site
- Rollups and shared masters across plants.
- Continuous improvement
- Yield, deviation, and cycle-time analytics.
- Run on a schedule
- Each run reads what closed since the last one.
Watch
A slow rise shows before it becomes a deviation.
Parameters, yields and cycle times are compared batch over batch, so a value creeping toward its limit is flagged with the batches behind it.
- Batches, cycle times, yield by product, open deviations
- Views refreshed on each scheduled run
- Flagged with the batches as evidence
Five batches in a row above the one before. Flagged on the Friday run, with the batches as evidence.
Report and Foresee
The report arrives before anyone asks.
Scheduled digests for the people who need them, like release readiness every Monday for QA leads, with qualifications about to lapse and reviews aging.
- Release readiness every Monday for QA leads
- Qualifications about to lapse
- Reviews aging past their target
| Ready for release | 12 |
| Waiting on QA review | 3 |
| Held by a deviation: B-2411-068, DEV-0412 | 1 |
| Qualification lapsing: tablet press TP-04, 6 days | 1 |
Read only. No record was created, changed or signed.
Scheduled runs
Agents work on your calendar.
Each agent runs on a schedule and reads your records and connected systems since its last run. Agents never create, change or sign a record.
- Each run reads what closed since the last one
- Read only: every change is made and signed by a person
- Every run and what it read, on the audit trail
Each run reads what closed since the last one.
How it works
From the line to the site head
- 01Scheduled runOn schedule, the agent reads what closed since its last run.
- 02ComparedYields and cycle times are compared batch over batch.
- 03Rolled upResults roll up across lines and plants.
- 04Sent to each leadEach lead gets what changed, with the evidence attached.
What changes
The week before, and the week after.
TODAY
- The trend was visible days before anyone saw it
- Release readiness built by hand in a monthly workbook
- A qualification lapse surfaces when it blocks a batch
- Nobody owns the reminder
WITH SYNNGULAR
- Release readiness reported to QA every Monday
- Parameters compared batch over batch, so a slow rise shows
- Foresee warns before a qualification lapses
- Each warning carries its evidence
What plant leadership uses
Every line and plant, run by run
- Multi-siteRollups and shared masters across plants.
- Continuous improvementYield, deviation, and cycle-time analytics.
- WatchBatches, yields, and cycle times, compared run to run.
- ReportScheduled digests for QA and production leads.
- ForeseeQualifications about to lapse and reviews aging, each with its evidence.
- Read onlyAgents never create, change, or sign a record.
$180K
value created in Morepen's BMR dossier engagement.Figures measured and reported by Morepen.
Read the case studyWhere plants start
Workflows leadership follows
- Quality and ManufacturingBatch record review and releaseReview by exception instead of line by line.See the workflow
- QualityDeviation investigation and CAPASee the drift before it becomes a deviation.See the workflow
- Manufacturing and QualityEquipment and training qualificationNever learn about a lapse from a blocked batch.See the workflow
Products
Products plant leadership uses
See it with your plant leads.
Bring one product and one workflow. We scope the pilot against your plant.